Month: August 2024

aguilas 76 arco arquitectura contemporanea b

Águilas 76

It is a complex made up of two buildings that were located within the property in such a way that they made the most of solar energy, considering the use of the views, the topography of the place, as well...

/ August 26, 2024
casa pc 27 y 63 arco arquitectura contemporanea a

Casa PC 27 y 63

On two different plots of land in Puerto Cancún, one of the largest real estate developments in Cancún, we designed two single-family homes for equal investment purposes, which we mirrored, to take advantage of the characteristics of both locations. The...

/ August 26, 2024
casa pc145 arco arquitectura contemporanea b

Casa PC145

The challenge presented by this house close to the sea, was to make the maximum use of the 227 sq m of the lot located in Puerto Cancún neighborhood, one of the most recent real estate developments in this jewel...

/ August 26, 2024
departamento tb arco arquitectura contemporanea a

Departamento TB

Two spaces were intervened in this apartment: the social area and the main bedroom. The main guideline in the project was to separate the social areas without completely closing them. To achieve this goal, ebony wood lattices were designed that...

/ August 26, 2024
departamento acueducto arco arquitectura contemporanea c

Departamento Acueducto

The remodeling project for Acueducto apartment was developed in a 190 sq m area for a 3 people family. Nothing was conserved from the original project in order to remodel completely all the areas to create a whole new home...

/ August 26, 2024
serfimex 2.0 arco arquitectura contemporanea f

Serfimex 2.0

The success of Serfimex led us to resume the additional space that was pending in the first phase and present a proposal for the growth of the commercial area. The proposal for Serfimex 2.0 arises based on the parameters defined...

/ August 26, 2024
corporativo p10 arco arquitectura contemporanea a

Corporativo 10

The development of this project is focused on the creation of a large office to be used by a single person. In addition to achieving an environment with a very masculine character, it was very important to consider all the...

/ August 26, 2024
corporativo p8 arco arquitectura contemporanea c

Corporativo P8

One of the main challenges of this project was taking full advantage of the triangular floor plan to have excellent functionality for this corporate. The correct design of the building provided an open plan and as the project required the...

/ August 26, 2024
serfimex arco arquitectura contemporanea b

Serfimex

This corporate interior design project is the result of the renovation of a 1,000 sq m floor plan located west of Mexico City, in an area where offices still have a strong presence. An elegant and tempered corporate image was...

/ August 22, 2024
swc social working club arco arquitectura contemporanea f

SWC Social Working Club

Social Working Club design arises from the opportunity to offer the market a different option, a building of smaller proportions that allows smaller offices with the possibility of growth within the same space. The main axis of the project is...

/ August 22, 2024
torre lev arco arquitectura contemporanea c

Torre Lev

Urban centers like Mexico City and its constant transformation and growth present interesting opportunities for architectural projects. Torre Lev is the answer for taking advantage of a 4,000 sq. m lot in an important corner and transform, what originally was...

/ August 22, 2024
corporativo p156 arco arquitectura contemporanea h

Corporativo P156

This contemporary looking building resolves its floor plan in a triangular way answering to the particular shape and location of the site located in front of Adolfo López Mateos Boulevard, which also forces the layout of its façade on this...

/ August 22, 2024